User Tools

Site Tools


mgv50-en

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
mgv50-en [2024/10/01 14:49] – created - external edit 127.0.0.1mgv50-en [2025/05/15 16:42] (current) – [Direct connection GCA50 to Intellibox, Twincenter or Digitrax] phg
Line 216: Line 216:
  
 ===== Configuring GCA50 ===== ===== Configuring GCA50 =====
-The MGV50 needs a configuration for each of the 16 in/output connections.\\+The GCA50 needs a configuration for each of the 16 in/output connections.\\
 This configuration is completely standard to Loco-I/O items.\\ This configuration is completely standard to Loco-I/O items.\\
 Rocrail has a built-in possibility to do this.\\ Rocrail has a built-in possibility to do this.\\
Line 253: Line 253:
  
 === Notes: === === Notes: ===
-On the connection **T** of the IB, the max. capability of the supply is only 500mA. \\+On the connection **T** of the IB, the max. capability of the supply is only 250mA. \\
 Twincenter needs update to Version 1.1 to enable setting of Interface to //Syntax = LocoNet//.\\ Twincenter needs update to Version 1.1 to enable setting of Interface to //Syntax = LocoNet//.\\
 ==== More power demand. ==== ==== More power demand. ====
Line 259: Line 259:
 resulting in overheating the VR1 regulator.\\ resulting in overheating the VR1 regulator.\\
 In that case, VR1 can be replaced by R-78e5.0, which can supply the needed current without overheating.\\ In that case, VR1 can be replaced by R-78e5.0, which can supply the needed current without overheating.\\
-Qustions ?  ask [[peter.giling@rocrail.net|Peter]].\\+Qustions ?  ask [[peter@phgiling.net|Peter]].\\
mgv50-en.1727786966.txt.gz · Last modified: 2024/10/01 14:49 by 127.0.0.1