managing a very short section of track between two railroad switchings

Post Reply
chuck51530
Posts: 5
Joined: 22.05.2018, 17:55

managing a very short section of track between two railroad switchings

Post by chuck51530 » 11.03.2019, 19:00

Hello,
My question is about managing a very short section of track between two railroad switchings. Having used i Train for 2 years I can indicate that with this software we link (in the sense of the software) this section with one of the tworailroad switchings side tip.
What do we do in Rocrail?
Thanks to the "elders" for telling me the best practice,
friendships
gare cachée.jpg

smitt48
Moderator
Posts: 5564
Joined: 04.04.2014, 01:07
Location: Kralendijk, Bonaire - Dutch Caribbean

Re: managing a very short section of track between two railroad switchings

Post by smitt48 » 11.03.2019, 19:06

Hi,

viewtopic.php?f=78&t=17596

Please don't ask the same question 3 times.

Post Reply

Return to “General”