(Solved) Creating Schedules Record option

(Solved) Creating Schedules Record option

Postby digital » 16.01.2018, 10:52

Please could someone advise how the record time option works when creating a schedule.
Many Thanks
John
Last edited by digital on 16.01.2018, 16:45, edited 2 times in total.
Kind Regards John
[Mac OS] [NCE Power Cab]
digital
 

Re: Creating Schedules Record option

Postby rjversluis » 16.01.2018, 11:41

Hi John,

just as its documented:
Record time

To 'learn' the schedule the departing times, this option can be used.
All destination depart times should be set to zero. In case of absolute, the first destination depart time must be set.
Best Regards, Rob.
:!: PS: Do not forget to attach the usual files.
:!: PS: Nicht vergessen die übliche Dateien an zu hängen.
[ macOS - Linux] - [ N: CBus - CAN-GCA ] - [ 0: RocNetNode - GCA-Pi ]
rjversluis
Site Admin
 

Re: Creating Schedules Record option

Postby digital » 16.01.2018, 15:03

Thank you Rob,
I have this working running fine when running from a terminus block to a terminus block with automatic swap placing.
However if I run to a non terminus block and have swap placing set, when the loco arrives in the block it stops but does not swap placing and thus returns no destination found.
Thanks
john
Kind Regards John
[Mac OS] [NCE Power Cab]
digital
 

Re: Creating Schedules Record option

Postby rjversluis » 16.01.2018, 15:17

Hi John,

seems the wrong subject; Your issue does have nothing todo with schedule recording but permissions in routes, blocks and loco details.
Best Regards, Rob.
:!: PS: Do not forget to attach the usual files.
:!: PS: Nicht vergessen die übliche Dateien an zu hängen.
[ macOS - Linux] - [ N: CBus - CAN-GCA ] - [ 0: RocNetNode - GCA-Pi ]
rjversluis
Site Admin
 

Re: Creating Schedules Record option

Postby digital » 16.01.2018, 15:36

Hi Rob,
My apologies.
I assumed as when I run the schedule with the times to run to each block set in the schedule everything thing works fine including swap placing.
I will have a good look through everything again and see where I am going wrong.
Apologies
Thanks
john
Kind Regards John
[Mac OS] [NCE Power Cab]
digital
 

Re: (Solved) Creating Schedules Record option

Postby digital » 16.01.2018, 16:48

I decided to start again from scratch and after recreating the schedule all now works.
Very handy feature
Thanks
John
Kind Regards John
[Mac OS] [NCE Power Cab]
digital
 


Return to General